SEARCHING
... please wait

Gümüshane Bahçecik

Download PDF data sheet
Gümüshane Bahçecik completed
Gümüshane Bahçecik completed

Particulars

Owner: unknown

Designer: unknown

Contractor: Durmaz Yatirim Insaat AS

Statistics

Type: Gravity

Purpose(s): Water Supply

Reservoir capacity: 3 m3x106

Height: 67 metres

Length: 273 metres

Volume of RCC: 148 m3x103

Total volume: unknown

Construction Dates

Start of Project: 06/17 (June 2017)

Start of RCC: 11/18 (November 2018)

End of RCC: /21 ( 2021)

End of Project: /22 ( 2022)

Country: Turkey

River: Şenkale Deresi

DMS Co-ordinates: 40˚27'34.87"N, 39˚36'5.95"E

DD Co-ordinates: 40.459686, 39.601654

Facings

Upstream

SlopeType
0.10Traditional concrete against formwork

Downstream

SlopeType
0.80Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Natural pozzolan (ASTM Class N)