Gümüshane Bahçecik
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: Durmaz Yatirim Insaat AS
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 3 m3x106
Height: 67 metres
Length: 273 metres
Volume of RCC: 148 m3x103
Total volume: unknown
Construction Dates
Start of Project: 06/17 (June 2017)
Start of RCC: 11/18 (November 2018)
End of RCC: —/21 (— 2021)
End of Project: —/22 (— 2022)
Country: Turkey
River: Şenkale Deresi
DMS Co-ordinates: 40˚27'34.87"N, 39˚36'5.95"E
DD Co-ordinates: 40.459686, 39.601654
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Natural pozzolan (ASTM Class N) | |