Gümüsören
Download PDF data sheet
Photo coming soon

Statistics
Type: Hardfill
Purpose(s): Hydropower / Irrigation / Water Supply
Reservoir capacity: 195 m3x106
Height: 37 metres
Length: 842 metres
Volume of RCC: 1890 m3x103
Total volume: 1943 m3x103
Construction Dates
Start of Project: —/11 (— 2011)
Start of RCC: —/13 (— 2013)
End of RCC: —/14 (— 2014)
End of Project: 06/15 (June 2015)
Country: Turkey
River: Zamanti
DMS Co-ordinates: 38˚14'36"N, 35˚38'48"E
DD Co-ordinates: 38.243332, 35.646667
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.76 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |
