SEARCHING
... please wait

Hassan II (formerly Sidi Said)

Download PDF data sheet
Hassan II (formerly Sidi Said) completed
Hassan II (formerly Sidi Said) completed

Particulars

Owner: unknown

Designer: INGEMA

Contractor: Italstrad (part of Astaldi Group)

Statistics

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

Reservoir capacity: 400 m3x106

Height: 115 metres

Length: 577 metres

Volume of RCC: 590 m3x103

Total volume: 690 m3x103

Construction Dates

Start of Project: 02/01 (February 2001)

Start of RCC: 03/03 (March 2003)

End of RCC: 04/04 (April 2004)

End of Project: 03/05 (March 2005)

Country: Morocco

River: Moulouya

DMS Co-ordinates: 32˚47'28.83"N, 4˚46'7.23"W

DD Co-ordinates: 32.791344, -4.768675

Facings

Upstream

SlopeType
VerticalTraditional concrete against precast concrete panels

Downstream

SlopeType
0.80Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
80
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
20