Hassan II (formerly Sidi Said)
Download PDF data sheet
Particulars
Owner: unknown
Designer: INGEMA
Contractor: Italstrad (part of Astaldi Group)
Statistics
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
Reservoir capacity: 400 m3x106
Height: 115 metres
Length: 577 metres
Volume of RCC: 590 m3x103
Total volume: 690 m3x103
Construction Dates
Start of Project: 02/01 (February 2001)
Start of RCC: 03/03 (March 2003)
End of RCC: 04/04 (April 2004)
End of Project: 03/05 (March 2005)
Country: Morocco
River: Moulouya
DMS Co-ordinates: 32˚47'28.83"N, 4˚46'7.23"W
DD Co-ordinates: 32.791344, -4.768675
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against precast concrete panels |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
65 |
80 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
15 | Natural pozzolan (ASTM Class N) |
20 |