Hassan II (formerly Sidi Said)
 Download PDF data sheet
Hassan II (formerly Sidi Said) completed 

Particulars
Owner: unknown
Designer: INGEMA
Contractor: Italstrad (part of Astaldi Group)
Statistics
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
Reservoir capacity: 400 m3x106
Height: 115 metres
Length: 577 metres
Volume of RCC: 590 m3x103
Total volume: 690 m3x103
Construction Dates
Start of Project: 02/01 (February 2001)
Start of RCC: 03/03 (March 2003)
End of RCC: 04/04 (April 2004)
End of Project: 03/05 (March 2005)
Country: Morocco
River: Moulouya
DMS Co-ordinates: 32˚47'28.83"N, 4˚46'7.23"W
DD Co-ordinates: 32.791344, -4.768675
Facings
Upstream
| Slope | Type | 
|---|---|
| Vertical | Traditional concrete against precast concrete panels | 
Downstream
| Slope | Type | 
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] | 
Spillway
| Slope | Type | 
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 300 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 65 | 
| 80 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 15 | Natural pozzolan (ASTM Class N) | 
| 20 | 

 
  
 