Helong
Download PDF data sheet
Particulars
Owner: unknown
Designer: Yanbian Investigation and Design Institute of Hydropower
Contractor: Helong Construction Bureau
Statistics
Type: Gravity
Purpose(s): Hydropower / Recreation / Water Supply
Reservoir capacity: 30 m3x106
Height: 30 metres
Length: 244 metres
Volume of RCC: 43 m3x103
Total volume: 89 m3x103
Construction Dates
Start of Project: 11/98 (November 1998)
Start of RCC: 08/99 (August 1999)
End of RCC: 01/02 (January 2002)
End of Project: 12/02 (December 2002)
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
ogee | RCC against precast concrete blocks [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 2000 |
Cementitious material
Cement (kg/m3) |
---|
113 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
113 | Low-lime flyash (ASTM Class F) |