SEARCHING
... please wait

Hongkou

Download PDF data sheet
Hongkou completed
Hongkou completed

Particulars

Owner: unknown

Designer: Fujian Institute of Investigation and Design of Hydropower

Contractor: Fujian (Minjiang) Construction Bureau

Statistics

Type: Gravity

Purpose(s): Hydropower / Water Supply

Reservoir capacity: 449 m3x106

Height: 130 metres

Length: 341 metres

Volume of RCC: 681 m3x103

Total volume: 830 m3x103

Construction Dates

Start of Project: /03 ( 2003)

Start of RCC: /05 ( 2005)

End of RCC: /07 ( 2007)

End of Project: /08 ( 2008)

Country: China

River: Huotong

DMS Co-ordinates: 26˚53'38.51"N, 119˚19'41.32"E

DD Co-ordinates: 26.894032, 119.32814

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type