Huilong PSS - Lower dam
Download PDF data sheet
Particulars
Owner: unknown
Designer: Yellow River Water Resources Committee, Investigation and Design Institute of Water Resources and Hydropower
Contractor: 11th Construction Bureau
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 2 m3x106
Height: 54 metres
Length: 175 metres
Volume of RCC: 88 m3x103
Total volume: 105 m3x103
Construction Dates
Start of Project: 06/01 (June 2001)
Start of RCC: —/02 (— 2002)
End of RCC: 06/04 (June 2004)
End of Project: —/05 (— 2005)
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |