Huilong PSS - Upper dam
Download PDF data sheet
Huilong PSS - Upper dam completed

Particulars
Owner: unknown
Designer: Yellow River Water Resources Committee, Investigation and Design Institute of Water Resources and Hydropower
Contractor: Anneng Construction Ltd.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 1 m3x106
Height: 54 metres
Length: 208 metres
Volume of RCC: 73 m3x103
Total volume: 76 m3x103
Construction Dates
Start of Project: 06/01 (June 2001)
Start of RCC: 11/02 (November 2002)
End of RCC: 11/03 (November 2003)
End of Project: —/05 (— 2005)
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| none |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |