Huilong PSS - Upper dam

Download PDF data sheet
Huilong PSS - Upper dam completed
Huilong PSS - Upper dam completed

Particulars

Owner: unknown

Designer: Yellow River Water Resources Committee, Investigation and Design Institute of Water Resources and Hydropower

Contractor: Anneng Construction Ltd.

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 1 m3x106

Height: 54 metres

Length: 208 metres

Volume of RCC: 73 m3x103

Total volume: 76 m3x103

Construction Dates

Start of Project: 06/01 (June 2001)

Start of RCC: 11/02 (November 2002)

End of RCC: 11/03 (November 2003)

End of Project: /05 ( 2005)

Country: China

River: unknown

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.75RCC against formwork (GEVR/GE-RCC)

Spillway

SlopeType
none 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)