SEARCHING
... please wait

Jalaur High Dam (JRMP 2)

< Back to search results

Download PDF data sheet
Jalaur High Dam (JRMP 2) completed
Jalaur High Dam (JRMP 2) completed

Particulars

Owner: National Irrigation Administration (NIA)

Designer: unknown

Contractor: Daewoo Engineering and Construction

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

Reservoir capacity: 229 m3x106

Height: 109 metres

Length: 267 metres

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: /19 ( 2019)

Start of RCC: /21 ( 2021)

End of RCC: /23 ( 2023)

End of Project: 07/24 (July 2024)

Country: Philippines

River: Jalaur

DMS Co-ordinates: 11˚10'24.91"N, 122˚27'37.18"E

DD Co-ordinates: 11.173586, 122.460327

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type