João Borges
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 24 metres
Length: 273 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/12 (— 2012)
Start of RCC: —/12 (— 2012)
End of RCC: —/13 (— 2013)
End of Project: 11/13 (November 2013)
Country: Brazil
River: Caneiras
DMS Co-ordinates: 27˚43'1.82"S, 50˚39'27.38"W
DD Co-ordinates: -27.717173, -50.657604
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|