Jucazinho
Download PDF data sheet
Particulars
Owner: unknown
Designer: AguaSolos
Contractor: Rodoférrea and DM Engenharia de Obras Joint Venture
Statistics
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
Reservoir capacity: 327 m3x106
Height: 63 metres
Length: 442 metres
Volume of RCC: 442 m3x103
Total volume: 470 m3x103
Construction Dates
Start of Project: 07/96 (July 1996)
Start of RCC: 11/96 (November 1996)
End of RCC: 10/98 (October 1998)
End of Project: —/99 (— 1999)
Country: Brazil
River: Capiibaribe
DMS Co-ordinates: 7˚58'1.00"S, 35˚44'31.26"W
DD Co-ordinates: -7.966944, -35.742016
Facings
Upstream
Slope | Type |
---|---|
Vertical | Reinforced conventional concrete cast after RCC placement |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
64 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
16 | Natural pozzolan (ASTM Class N) |