Julius Nyerere (formerly Rufiji)
Download PDF data sheet
Particulars
Owner: unknown
Designer: AC-EE (Arab Contractors and Elsewedy Electic S.A.E. JV)
Contractor: AC-EE (Arab Contractors and Elsewedy Electic S.A.E. JV) (SinoHydro Co. Ltd. (11th Construction Bureau) dam sub-Contractor)
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 3680 m3x106
Height: 131 metres
Length: 1025 metres
Volume of RCC: 1420 m3x103
Total volume: 1940 m3x103
Construction Dates
Start of Project: 12/18 (December 2018)
Start of RCC: 10/20 (October 2020)
End of RCC: —/22 (— 2022)
End of Project: 12/23 (December 2023)
Country: Tanzania
River: Rufiji
DMS Co-ordinates: 07˚48'15.3"S, 37˚50'47.48"E
DD Co-ordinates: -7.80425, 37.846523
Facings
Upstream
Slope | Type |
---|---|
0.20 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
93 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
62 | Low-lime flyash (ASTM Class F) |