Julius Nyerere (formerly Rufiji)

Download PDF data sheet
Julius Nyerere (formerly Rufiji) under construction
Julius Nyerere (formerly Rufiji) under construction

Particulars

Owner: unknown

Designer: AC-EE (Arab Contractors and Elsewedy Electic S.A.E. JV)

Contractor: AC-EE (Arab Contractors and Elsewedy Electic S.A.E. JV) (SinoHydro Co. Ltd. (11th Construction Bureau) dam sub-Contractor)

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 3680 m3x106

Height: 131 metres

Length: 1025 metres

Volume of RCC: 1420 m3x103

Total volume: 1940 m3x103

Construction Dates

Start of Project: 12/18 (December 2018)

Start of RCC: 10/20 (October 2020)

End of RCC: /22 ( 2022)

End of Project: 12/23 (December 2023)

Country: Tanzania

River: Rufiji

DMS Co-ordinates: 07˚48'15.3"S, 37˚50'47.48"E

DD Co-ordinates: -7.80425, 37.846523

Facings

Upstream

SlopeType
0.20RCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.75RCC against formwork (GEVR/GE-RCC)

Spillway

SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
93
Pozzolan (kg/m3)Pozzolan Type
62Low-lime flyash (ASTM Class F)