Koris Gefiri (Maiden’s bridge)
Download PDF data sheet
Photo coming soon

Statistics
Type: Hardfill
Purpose(s): Irrigation / Water Supply
Reservoir capacity: 3 m3x106
Height: 42 metres
Length: 221 metres
Volume of RCC: 170 m3x103
Total volume: 190 m3x103
Construction Dates
Start of Project: 11/05 (November 2005)
Start of RCC: 03/07 (March 2007)
End of RCC: 07/10 (July 2010)
End of Project: —/16 (— 2016)
Country: Greece
River: Partheni
DMS Co-ordinates: 38˚22'27.85"N, 26˚06'27.56"E
DD Co-ordinates: 38.374405, 26.107656
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 450 | 450 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 10 | Natural pozzolan (ASTM Class N) |
