Las Cruces
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: Technoproject
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation
Reservoir capacity: 2485 m3x106
Height: 185 metres
Length: 815 metres
Volume of RCC: 2 m3x103
Total volume: 2400 m3x103
Construction Dates
Start of Project: —/17 (— 2017)
Start of RCC: —/18 (— 2018)
End of RCC: —/20 (— 2020)
End of Project: —/21 (— 2021)
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.80 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|