Lidi
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: SinoHydro Construction Bureau Nº14 Co. Ltd.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 75 m3x106
Height: 75 metres
Length: 346 metres
Volume of RCC: unknown
Total volume: 1100 m3x103
Construction Dates
Start of Project: —/10 (— 2010)
Start of RCC: —/14 (— 2014)
End of RCC: —/18 (— 2018)
End of Project: —/19 (— 2019)
Country: China
River: Lancang
DMS Co-ordinates: 27˚54'32.4"N, 98˚57'28.8"E
DD Co-ordinates: 27.909, 98.958
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|