Lizhou
Download PDF data sheet
Lizhou completed

Particulars
Owner: unknown
Designer: Hydrochina Guiyang Engineering Corporation
Contractor: SinoHydro Construction Bureau Nº7 Co. Ltd.
Statistics
Type: Thin Arch
Purpose(s): Hydropower / Water Supply
Reservoir capacity: 190 m3x106
Height: 132 metres
Length: 211 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/09 (— 2009)
Start of RCC: —/11 (— 2011)
End of RCC: —/13 (— 2013)
End of Project: —/14 (— 2014)
Country: China
River: Muli
DMS Co-ordinates: 28˚5'23.48"N, 100˚56'2.00"E
DD Co-ordinates: 28.089855, 100.933891
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|