Maobaguan
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: North-West Investigation Design and Research Institute,CHECC
Contractor: 3rd Construction Bureau
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: 2 m3x106
Height: 66 metres
Length: 120 metres
Volume of RCC: 81 m3x103
Total volume: 106 m3x103
Construction Dates
Start of Project: —/00 (— 2000)
Start of RCC: —/02 (— 2002)
End of RCC: —/03 (— 2003)
End of Project: —/04 (— 2004)
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
