Maobaguan
Download PDF data sheet
Particulars
Owner: unknown
Designer: North-West Investigation Design and Research Institute,CHECC
Contractor: 3rd Construction Bureau
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: 2 m3x106
Height: 66 metres
Length: 120 metres
Volume of RCC: 81 m3x103
Total volume: 106 m3x103
Construction Dates
Start of Project: —/00 (— 2000)
Start of RCC: —/02 (— 2002)
End of RCC: —/03 (— 2003)
End of Project: —/04 (— 2004)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|