SEARCHING
... please wait

Melen

Download PDF data sheet
Melen completed
Melen completed

Particulars

Owner: unknown

Designer: ES Design Engineering Consultancy Limited Co.

Contractor: Ecetur-Yöntan Consortium

Statistics

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

Reservoir capacity: 693 m3x106

Height: 124 metres

Length: 944 metres

Volume of RCC: 1871 m3x103

Total volume: 2096 m3x103

Construction Dates

Start of Project: /13 ( 2013)

Start of RCC: 06/15 (June 2015)

End of RCC: 03/19 (March 2019)

End of Project: 05/19 (May 2019)

Country: Turkey

River: Melen

DMS Co-ordinates: 41˚00'15"N, 30˚57'52"E

DD Co-ordinates: 41.004112, 30.964493

Facings

Upstream

SlopeType
0.15RCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]

Spillway

SlopeType
0.70RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
60Low-lime flyash (ASTM Class F)