Moínho
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 1 m3x106
Height: 22 metres
Length: unknown
Volume of RCC: 9 m3x103
Total volume: 25 m3x103
Construction Dates
Start of Project: —/09 (— 2009)
Start of RCC: —/10 (— 2010)
End of RCC: —/11 (— 2011)
End of Project: —/11 (— 2011)
Country: Brazil
River: Bernado Jose
DMS Co-ordinates: 27˚46'20.25"S, 51˚20'1.73"W
DD Co-ordinates: -27.772291, -51.334217
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
68 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
17 | Natural pozzolan (ASTM Class N) |