Mosquitão
Download PDF data sheet
Particulars
Owner: unknown
Designer: SBB Engenharia
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 19 m3x106
Height: 32 metres
Length: 236 metres
Volume of RCC: 57 m3x103
Total volume: 76 m3x103
Construction Dates
Start of Project: —/04 (— 2004)
Start of RCC: —/05 (— 2005)
End of RCC: —/06 (— 2006)
End of Project: —/07 (— 2007)
Country: Brazil
River: unknown
DMS Co-ordinates: 16˚20'33.73"S, 51˚26'20.52"W
DD Co-ordinates: -16.342703, -51.439034
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|