Murum
Download PDF data sheet
Murum completed

Particulars
Owner: unknown
Designer: Changjiang Survey, Planning, Design and Research Co. Ltd.
Contractor: Three Gorges Development Co
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 12043 m3x106
Height: 146 metres
Length: 440 metres
Volume of RCC: 1520 m3x103
Total volume: 1660 m3x103
Construction Dates
Start of Project: 10/08 (October 2008)
Start of RCC: 05/10 (May 2010)
End of RCC: 07/13 (July 2013)
End of Project: —/15 (— 2015)
Country: Malaysia
River: Murum
DMS Co-ordinates: 2˚38'58.25"N, 114˚22'2.57"E
DD Co-ordinates: 2.649514, 114.367378
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.20 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork |
| 0.80 |
Spillway
| Slope | Type |
|---|---|
| 0.70 | |
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 88 |
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 88 | Low-lime flyash (ASTM Class F) |
| 72 |
