SEARCHING
... please wait

Musatepe

Download PDF data sheet
Musatepe completed
Musatepe completed

Particulars

Owner: unknown

Designer: unknown

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 13 m3x106

Height: 66 metres

Length: 165 metres

Volume of RCC: 131 m3x103

Total volume: 138 m3x103

Construction Dates

Start of Project: 09/08 (September 2008)

Start of RCC: /13 ( 2013)

End of RCC: /14 ( 2014)

End of Project: /15 ( 2015)

Country: Turkey

River: Robozik

DMS Co-ordinates: 37˚23'16.68"N, 42˚53'56.76"E

DD Co-ordinates: 37.387966, 42.899097

Facings

Upstream

SlopeType
0.10Traditional concrete against formwork

Downstream

SlopeType
0.80RCC against formwork (GEVR/GE-RCC)

Spillway

SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
77
Pozzolan (kg/m3)Pozzolan Type
63Natural pozzolan (ASTM Class N)