Musatepe
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 13 m3x106
Height: 66 metres
Length: 165 metres
Volume of RCC: 131 m3x103
Total volume: 138 m3x103
Construction Dates
Start of Project: 09/08 (September 2008)
Start of RCC: —/13 (— 2013)
End of RCC: —/14 (— 2014)
End of Project: —/15 (— 2015)
Country: Turkey
River: Robozik
DMS Co-ordinates: 37˚23'16.68"N, 42˚53'56.76"E
DD Co-ordinates: 37.387966, 42.899097
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 1200 |
Cementitious material
Cement (kg/m3) |
---|
77 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
63 | Natural pozzolan (ASTM Class N) |