Nam Theun 1

Download PDF data sheet
Nam Theun 1 completed
Nam Theun 1 completed

Particulars

Owner: unknown

Designer: Pöyry Energy Ltd.

Contractor: Initially CMC Ravenna, Song Da Corporation J.V.; replaced by SinoHydro (Construction Bureau Nº3)

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 3009 m3x106

Height: 187 metres

Length: 772 metres

Volume of RCC: 4141 m3x103

Total volume: 4341 m3x103

Construction Dates

Start of Project: 08/15 (August 2015)

Start of RCC: 01/19 (January 2019)

End of RCC: 01/22 (January 2022)

End of Project: 07/22 (July 2022)

Country: Laos

River: Nam Kading, aka Nam Theun

DMS Co-ordinates: 18˚21'17.77"N, 104˚8'51.59"E

DD Co-ordinates: 18.355, 104.147667

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
100
120
Pozzolan (kg/m3)Pozzolan Type
80Low-lime flyash (ASTM Class F)
130