Nam Theun 1
Download PDF data sheet
Particulars
Owner: unknown
Designer: Pöyry Energy Ltd.
Contractor: Initially CMC Ravenna, Song Da Corporation J.V.; replaced by SinoHydro (Construction Bureau Nº3)
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 3009 m3x106
Height: 187 metres
Length: 772 metres
Volume of RCC: 4141 m3x103
Total volume: 4341 m3x103
Construction Dates
Start of Project: 08/15 (August 2015)
Start of RCC: 01/19 (January 2019)
End of RCC: 01/22 (January 2022)
End of Project: 07/22 (July 2022)
Country: Laos
River: Nam Kading, aka Nam Theun
DMS Co-ordinates: 18˚21'17.77"N, 104˚8'51.59"E
DD Co-ordinates: 18.355, 104.147667
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
100 |
120 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
80 | Low-lime flyash (ASTM Class F) |
130 |