Nam Theun 1
 Download PDF data sheet
Nam Theun 1 completed 

Particulars
Owner: unknown
Designer: Pöyry Energy Ltd.
Contractor: Initially CMC Ravenna, Song Da Corporation J.V.; replaced by SinoHydro (Construction Bureau Nº3)
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 3009 m3x106
Height: 187 metres
Length: 772 metres
Volume of RCC: 4141 m3x103
Total volume: 4341 m3x103
Construction Dates
Start of Project: 08/15 (August 2015)
Start of RCC: 01/19 (January 2019)
End of RCC: 01/22 (January 2022)
End of Project: 07/22 (July 2022)
Country: Laos
River: Nam Kading, aka Nam Theun
DMS Co-ordinates: 18˚21'17.77"N, 104˚8'51.59"E
DD Co-ordinates: 18.355, 104.147667
Facings
Upstream
| Slope | Type | 
|---|---|
Downstream
| Slope | Type | 
|---|---|
Spillway
| Slope | Type | 
|---|---|
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 3000 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 100 | 
| 120 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 80 | Low-lime flyash (ASTM Class F) | 
| 130 | 

 
  
 