SEARCHING
... please wait

Nankangheerji

Download PDF data sheet
Photo coming soon

Particulars

Owner: unknown

Designer: Survey & Design Institute, SinoHydro Construction Bureau Nº14 Co. Ltd.

Contractor: SinoHydro Construction Bureau Nº14 Co. Ltd.

Statistics

Type: Thin Arch

Purpose(s): Hydropower

Reservoir capacity: 31 m3x106

Height: 68 metres

Length: 179 metres

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: /10 ( 2010)

Start of RCC: /11 ( 2011)

End of RCC: /12 ( 2012)

End of Project: /12 ( 2012)

Country: China

River: Nankang

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type