SEARCHING
... please wait

Naruse

Download PDF data sheet
Naruse under construction
Naruse under construction

Particulars

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Designer: Nippon-Koei Co Ltd

Contractor: Kajima Corporation & Maeda Corporation & Takenaka Civil Engineering & Construction Co., Ltd. JV

Statistics

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

Reservoir capacity: 79 m3x106

Height: 115 metres

Length: 755 metres

Volume of RCC: 4450 m3x103

Total volume: 4850 m3x103

Construction Dates

Start of Project: 05/18 (May 2018)

Start of RCC: 10/19 (October 2019)

End of RCC: 08/24 (August 2024)

End of Project: 11/26 (November 2026)

Country: Japan

River: Naruse

DMS Co-ordinates: 39˚2'21.54"N, 140˚43'15.32"E

DD Co-ordinates: 39.039318, 140.720917

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type