Naruse
Download PDF data sheet
Naruse under construction

Particulars
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Designer: Nippon-Koei Co Ltd
Contractor: Kajima Corporation & Maeda Corporation & Takenaka Civil Engineering & Construction Co., Ltd. JV
Statistics
Type: Hardfill
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
Reservoir capacity: 79 m3x106
Height: 115 metres
Length: 755 metres
Volume of RCC: 4450 m3x103
Total volume: 4850 m3x103
Construction Dates
Start of Project: 05/18 (May 2018)
Start of RCC: 10/19 (October 2019)
End of RCC: 08/24 (August 2024)
End of Project: 11/26 (November 2026)
Country: Japan
River: Naruse
DMS Co-ordinates: 39˚2'21.54"N, 140˚43'15.32"E
DD Co-ordinates: 39.039318, 140.720917
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|