Niulu
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 66 m3x106
Height: 80 metres
Length: 391 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/18 (— 2018)
Start of RCC: —/20 (— 2020)
End of RCC: —/21 (— 2021)
End of Project: —/22 (— 2022)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|