SEARCHING
... please wait

Nuoc Trong

Download PDF data sheet
Nuoc Trong completed
Nuoc Trong completed

Particulars

Owner: unknown

Designer: HEC1 (Hydraulic Engineering Consultants Corporation Nº1)

Contractor: Construction Company 47

Statistics

Type: Gravity

Purpose(s): Hydropower / Irrigation

Reservoir capacity: 290 m3x106

Height: 69 metres

Length: 518 metres

Volume of RCC: 446 m3x103

Total volume: 600 m3x103

Construction Dates

Start of Project: 10/07 (October 2007)

Start of RCC: 07/09 (July 2009)

End of RCC: 12/10 (December 2010)

End of Project: 05/11 (May 2011)

Country: Vietnam

River: Tra Kluc

DMS Co-ordinates: 15˚4'51.05"N, 108˚24'42.81"E

DD Co-ordinates: 15.080848, 108.411896

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
125
80
Pozzolan (kg/m3)Pozzolan Type
218Natural pozzolan (ASTM Class N)
230