Nuoc Trong
Download PDF data sheet
Nuoc Trong completed

Particulars
Owner: unknown
Designer: HEC1 (Hydraulic Engineering Consultants Corporation Nº1)
Contractor: Construction Company 47
Statistics
Type: Gravity
Purpose(s): Hydropower / Irrigation
Reservoir capacity: 290 m3x106
Height: 69 metres
Length: 518 metres
Volume of RCC: 446 m3x103
Total volume: 600 m3x103
Construction Dates
Start of Project: 10/07 (October 2007)
Start of RCC: 07/09 (July 2009)
End of RCC: 12/10 (December 2010)
End of Project: 05/11 (May 2011)
Country: Vietnam
River: Tra Kluc
DMS Co-ordinates: 15˚4'51.05"N, 108˚24'42.81"E
DD Co-ordinates: 15.080848, 108.411896
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 125 |
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 218 | Natural pozzolan (ASTM Class N) |
| 230 |
