Passo do Meio
 Download PDF data sheet
Passo do Meio completed 

Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 27 m3x106
Height: 31 metres
Length: 110 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/07 (— 2007)
Start of RCC: —/08 (— 2008)
End of RCC: —/09 (— 2009)
End of Project: —/10 (— 2010)
Country: Brazil
River: das Antas
DMS Co-ordinates: 28˚48'23.39"S, 50˚36'47.19"W
DD Co-ordinates: -28.806498, -50.61311
Facings
Upstream
| Slope | Type | 
|---|---|
Downstream
| Slope | Type | 
|---|---|
Spillway
| Slope | Type | 
|---|---|
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
Cementitious material
| Cement (kg/m3) | 
|---|
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|

 
 