Passo do Meio
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 27 m3x106
Height: 31 metres
Length: 110 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/07 (— 2007)
Start of RCC: —/08 (— 2008)
End of RCC: —/09 (— 2009)
End of Project: —/10 (— 2010)
Country: Brazil
River: das Antas
DMS Co-ordinates: 28˚48'23.39"S, 50˚36'47.19"W
DD Co-ordinates: -28.806498, -50.61311
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|