Piedade
Download PDF data sheet
Piedade completed

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 18 m3x106
Height: 30 metres
Length: 397 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/06 (— 2006)
Start of RCC: —/08 (— 2008)
End of RCC: —/09 (— 2009)
End of Project: 08/10 (August 2010)
Country: Brazil
River: Piedade
DMS Co-ordinates: 18˚41'20.09"S, 49˚0'35.07"W
DD Co-ordinates: -18.688913, -49.009743
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|