Qilinguan
Download PDF data sheet
Particulars
Owner: unknown
Designer: Yichang City Investigation and Design Institute of Hydropower
Contractor: Shanxi Construction Bureau
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: 14 m3x106
Height: 77 metres
Length: 140 metres
Volume of RCC: 45 m3x103
Total volume: 55 m3x103
Construction Dates
Start of Project: —/05 (— 2005)
Start of RCC: —/06 (— 2006)
End of RCC: —/07 (— 2007)
End of Project: —/08 (— 2008)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|