Santo Antonio
Download PDF data sheet
Particulars
Owner: unknown
Designer: Intertechne Consultores Associasdos
Contractor: CCSA (Consórcio Construtor Santo Antonio)
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 17 m3x106
Height: 44 metres
Length: 285 metres
Volume of RCC: 81 m3x103
Total volume: 105 m3x103
Construction Dates
Start of Project: —/09 (— 2009)
Start of RCC: —/10 (— 2010)
End of RCC: —/11 (— 2011)
End of Project: 02/12 (February 2012)
Country: Brazil
River: Rio Grande
DMS Co-ordinates: 22˚08'22.24"S, 42˚21'7.28"W
DD Co-ordinates: -22.139511, -42.35202
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|