Serra do Facão
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 5199 m3x106
Height: 92 metres
Length: 326 metres
Volume of RCC: 610 m3x103
Total volume: 742 m3x103
Construction Dates
Start of Project: 02/07 (February 2007)
Start of RCC: —/08 (— 2008)
End of RCC: —/09 (— 2009)
End of Project: 10/10 (October 2010)
Country: Brazil
River: Sao Marcos
DMS Co-ordinates: 18˚2'45.9"S, 47˚40'29.68"W
DD Co-ordinates: -18.046083, -47.674911
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | Natural pozzolan (ASTM Class N) |