Shafaroud
Download PDF data sheet
Photo coming soon

Particulars
Owner: Gilan Province Water Authority
Designer: Mahab Ghodss
Contractor: Jyane Construction Co.
Statistics
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
Reservoir capacity: 98 m3x106
Height: 137 metres
Length: 372 metres
Volume of RCC: 950 m3x103
Total volume: 1180 m3x103
Construction Dates
Start of Project: 03/12 (March 2012)
Start of RCC: 03/16 (March 2016)
End of RCC: —/20 (— 2020)
End of Project: 03/22 (March 2022)
Country: Iran
River: Shafaroud
DMS Co-ordinates: 37˚31'45"N, 49˚06'7"E
DD Co-ordinates: 37.529167, 49.101944
Facings
Upstream
Slope | Type |
---|---|
0.10 | RCC against formwork (GEVR/GE-RCC) |
0.50 |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|