Shafaroud
Download PDF data sheet
Particulars
Owner: unknown
Designer: Mahab Ghodss
Contractor: Jiyan Construction Co.
Statistics
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
Reservoir capacity: 53 m3x106
Height: 101 metres
Length: 372 metres
Volume of RCC: 950 m3x103
Total volume: 1180 m3x103
Construction Dates
Start of Project: 03/12 (March 2012)
Start of RCC: 03/20 (March 2020)
End of RCC: 07/22 (July 2022)
End of Project: 11/22 (November 2022)
Country: Iran
River: Shafaroud
DMS Co-ordinates: 37˚31'25.18"N, 49˚5'17.37"E
DD Co-ordinates: 37.523659, 49.088158
Facings
Upstream
Slope | Type |
---|---|
0.10 | RCC against formwork (GEVR/GE-RCC) |
0.50 |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|