SEARCHING
... please wait

Shibanshui

Download PDF data sheet
Shibanshui completed
Shibanshui completed

Particulars

Owner: unknown

Designer: Chengdu Hydroelectric Investigation and Design Institute, MOE & MWR

Contractor: 3rd Construction Bureau, MOE and MWR

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower / Recreation

Reservoir capacity: 105 m3x106

Height: 84 metres

Length: 445 metres

Volume of RCC: 335 m3x103

Total volume: 564 m3x103

Construction Dates

Start of Project: 12/92 (December 1992)

Start of RCC: 04/94 (April 1994)

End of RCC: /95 ( 1995)

End of Project: /96 ( 1996)

Country: China

River: Longxihe

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.65Traditional concrete against formwork

Spillway

SlopeType
0.65Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
3001000

Cementitious material

Cement (kg/m3)
126
60
Pozzolan (kg/m3)Pozzolan Type
84Low-lime flyash (ASTM Class F)
90