Shibanshui
Download PDF data sheet
Particulars
Owner: unknown
Designer: Chengdu Hydroelectric Investigation and Design Institute, MOE & MWR
Contractor: 3rd Construction Bureau, MOE and MWR
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Recreation
Reservoir capacity: 105 m3x106
Height: 84 metres
Length: 445 metres
Volume of RCC: 335 m3x103
Total volume: 564 m3x103
Construction Dates
Start of Project: 12/92 (December 1992)
Start of RCC: 04/94 (April 1994)
End of RCC: —/95 (— 1995)
End of Project: —/96 (— 1996)
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.65 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.65 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 1000 |
Cementitious material
Cement (kg/m3) |
---|
126 |
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
84 | Low-lime flyash (ASTM Class F) |
90 |