SEARCHING
... please wait

Shihu

Download PDF data sheet
Shihu completed
Shihu completed

Particulars

Owner: unknown

Designer: Hebei Investigation and Design Institute of Water Resources

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

Reservoir capacity: 58 m3x106

Height: 56 metres

Length: 193 metres

Volume of RCC: 162 m3x103

Total volume: 354 m3x103

Construction Dates

Start of Project: /05 ( 2005)

Start of RCC: /06 ( 2006)

End of RCC: /07 ( 2007)

End of Project: /08 ( 2008)

Country: China

River: Lituohe

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type