SEARCHING
... please wait

Shuidong

Download PDF data sheet
Shuidong completed
Shuidong completed

Particulars

Owner: unknown

Designer: Fujian Institute of Investigation and Design of Water Conservancy and Electric Power

Contractor: Fujian (Minjiang) Construction Bureau

Statistics

Type: Gravity

Purpose(s): Hydropower / Navigation

Reservoir capacity: 108 m3x106

Height: 63 metres

Length: 197 metres

Volume of RCC: 126 m3x103

Total volume: 184 m3x103

Construction Dates

Start of Project: 04/91 (April 1991)

Start of RCC: 11/92 (November 1992)

End of RCC: 10/93 (October 1993)

End of Project: 12/95 (December 1995)

Country: China

River: Youxi

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
VerticalRCC against precast concrete panels

Downstream

SlopeType
0.75RCC against precast concrete blocks

Spillway

SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
90Low-lime flyash (ASTM Class F)