Singrobo-Ahouaty
Download PDF data sheet
Particulars
Owner: unknown
Designer: Eiffage (EPC Contract)
Contractor: Eiffage
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 105 m3x106
Height: 24 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 10/19 (October 2019)
Start of RCC: —/21 (— 2021)
End of RCC: —/22 (— 2022)
End of Project: 03/23 (March 2023)
Country: Ivory Coast
River: Bandama
DMS Co-ordinates: 06˚04'45.86"N, 04˚56'28.90"W
DD Co-ordinates: 6.079406, -4.941361
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|