Sinop
Download PDF data sheet
Particulars
Owner: unknown
Designer: Intertechne Consultores Associasdos
Contractor: Construtora Triunfo
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 17 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/14 (— 2014)
Start of RCC: —/15 (— 2015)
End of RCC: —/17 (— 2017)
End of Project: —/19 (— 2019)
Country: Brazil
River: Teles Pires
DMS Co-ordinates: 11˚16'14.39"S, 55˚27'3.91"W
DD Co-ordinates: -11.270663, -55.451084
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|